Customization: | Available |
---|---|
After-sales Service: | Online Video Support |
Warranty: | 1 Year |
Suppliers with verified business licenses
- Precise matching design with advanced energy conservation control can reduce the oil consumption of the machine.- Low emission meets the Europe II standard.
- The adoption of new cooling fan and large-scale silencer lowers the noise of the machine.
- The adoption of the advanced turbocharging technique increases the highland adaptability of the machine.
- Automatic preheating system improves the working capacity in the low temperature.
- Unique fan cover with the shape of hopper opening greatly improves the air supply of the engine and the radiating capacity of the system, guaranteeing the successive high-efficient work of the machine.
- Restart prevention system effectively avoids the misoperation, and improve s the use security of the machine.
Model | Unit | XE370C | ||
---|---|---|---|---|
Operating weight | kg | 36600 | ||
Standard bucketcapacity | m 3 | 1.6 | ||
Engine | Engine Model | |||
Type | Direct injection | --- | √ | |
Four strokes | --- | √ | ||
Water cooling | --- | √ | ||
Turbo charged | --- | √ | ||
Air to air intercooler | --- | √ | ||
No. of cylinders | --- | 6 | ||
Rated power/speed | kW/ r/min | 184/2000 | ||
Max. torque/speed | N.m | 872.8/1700 | ||
Displacement | L | 7.79 | ||
Main data | Travel speed | km/h | 5.4/3.2 | |
Max. gradeability | % | 58 | ||
Swing speed | r/min | 10.1 | ||
Ground pressure | kPa | 67.8 | ||
Bucket digging force at power max. | kN | 242 | ||
Arm crowd force at power max. | kN | 174 | ||
Hydraulic | Main pump | -- | 2Plunger pump | |
Rate flow | L/min | 2x280 | ||
Max pressure of system | MPa | 31.5/34.3 | ||
Max pressure of travel equipment | MPa | -- | ||
Max pressure of swing equipment | MPa | -- | ||
Pilot press setting | MPa | 3.9 | ||
Oil & Fuel refilling | Fuel tank capacity | L | 600 | |
Hydraulic tank capacity | L | 320 | ||
Engine lubrication | L | 28 | ||
Dimensions | Overall length | mm | 11105 | |
Overall width | mm | 3190 | ||
Overall height | mm | 3300 | ||
Overall width of upperstructure | mm | 2960 | ||
Track length | mm | 5070 | ||
Overall width of undercarriage | mm | 3190 | ||
Standard track shoe width | mm | 600 | ||
Track length on ground | mm | 4040 | ||
Track gauge | mm | 2590 | ||
Clearance under counter weight | mm | 1197 | ||
Ground clearance | mm | 500 | ||
Tail swing radius | mm | 3450 | ||
Working Range | Max. digging height | mm | 10445 | |
Max. dumping height | mm | 7287 | ||
Max. digging depth | mm | 7423 | ||
Max. digging depth of cut for | mm | 7266 | ||
Max. vertical wall digging depth | mm | 6776 | ||
Max. digging reach | mm | 11114 | ||
Max. digging reach | mm | 10907 | ||
Max. turning radius | mm | 4376 |
1. HOW IS YOUR PRICE COMPARED WITH MANUFACTURERS OR FACTORIES?
we work as the leading dealers of various leading China construction machinery manufacture/I factories, and are constantly treated with best dealership price. From numerous comparison and feedback from clients, our prices is more competitive than the price from manufacturers/ factories.
2. HOW IS YOUR DELIVERY TIME?
In general circumstance, we can have an immediate delivery of regular machines for our clients within 7 days, because we have a variety of resources to check machines in stock, locally and nation widely, and to receive machines in timely manner. But for manufacturers/ I factories, It will take more than 30 days to produce the ordered machine.
3. HOW SOON CAN YOU RESPOND CLIENT INQUIRIES?
Our team is consisted of a group of diligent and dynamic people, working 24hrs/ 7days to respond client ,inquiries and questions all the time. Most problems can be solved within 8 hours while manufacturers/factories will take much longer to give response.
4. HOW LONG WILL YOUR PRICE BE VALID?
we are a tender and friendly supplier, never greedy on windfall profit. Basically, our price remains stable through the year. We only adjust our price based on two situations: (1) The rate of USD: RMB varies significantly according to the international currency exchange rates, (2) Manufacturers/ factories adjusted the machine price, because of the increasing labor cost and raw material cost.
5. WHAT LOGISTICS WAYS YOU CAN WORK FOR SHIPMENT?
we can ship construction machinery by various transportation tools.
(1) For 80% of our shipment, the machine will go by sea, to all main continents such as Africa, South America, Middle East, Oceania and Southeast Asia etc., either by container or RoRo / Bulk shipment.
(2) For inland neighbourhood countries of China, such as Russia, Mongolia, Kazakhstan, Kyrgyzstan, Tajikistan, Uzbekistan Turkmenistan etc., we can send machines by road or railway.
(3) For light spare parts in urgent demand, we can send it by international courier service, such as DHL, TNT, UPS, or Fedex