Customization: | Available |
---|---|
After-sales Service: | Online Video Support |
Warranty: | 1 Year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
XM405 milling machine is an asphalt road maintenance and construction machine mainly used for the maintenance operations of municipal roads and as the auxiliany construction implement for large milling machines.
It can realize the small-area digging and renovation of asphalt concrete pavements, including highways, downtown roads, aiports, cargo yards, and parking lots.
Performance Characteristics:
* Traveling system: Hydraulic + mechanical drive mode, constantly variable speed change, and high and low gears.
* Milling system: The hydraulic + mechanical drive mode is applied to achieve efficient and powerful milling. Guarantee the working life of milling cutter.
* Steering system: The full-hydraulic front axle steering features small steering radius and flexible steering.
* Sprinkling system: Reduce the diffusion of dusts during milling. Realize the longer working time of machine without interruption.
* Engine system: The advanced, matured, and reliable Shangchai engine is applied, featuring strong power and low fuel consumption.
Item
|
Unit
|
XM405
|
|
Maximum milling width
|
mm
|
500
|
|
Maximum milling depth
|
mm
|
120
|
|
Milling wheel
|
Tool spacing
|
mm
|
12/6/6
|
Number of tools
|
|
48
|
|
Milling wheel diameter (with tool)
|
mm
|
5880
|
|
|
|
|
|
Diesel engines
|
Cooling method
|
|
Water cooling
|
Model
|
|
|
|
|
|
|
|
Rated power
|
kw
|
81
|
|
Engine speed
|
rpm
|
2200
|
|
|
|
|
|
Speed/grade ability
|
Working speed
|
m/min
|
0-33
|
Walking speed
|
km/h
|
0-7.5
|
|
Theoretical Gradeability (Working Blocks)
|
%
|
50
|
|
Ground clearance
|
|
120
|
|
Weight / load
|
Shipping weight
|
|
|
Working weight
|
kg
|
5200
|
|
Box volume
|
Fuel tank
|
L
|
120
|
Hydraulic tank
|
L
|
70
|
|
Water tank
|
L
|
300
|
|
Electrical system
|
|
1. HOW IS YOUR PRICE COMPARED WITH MANUFACTURERS OR FACTORIES?
we work as the leading dealers of various leading China construction machinery manufacture/I factories, and are constantly treated with best dealership price. From numerous comparison and feedback from clients, our prices is more competitive than the price from manufacturers/ factories.
2. HOW IS YOUR DELIVERY TIME?
In general circumstance, we can have an immediate delivery of regular machines for our clients within 7 days, because we have a variety of resources to check machines in stock, locally and nation widely, and to receive machines in timely manner. But for manufacturers/ I factories, It will take more than 30 days to produce the ordered machine.
3. HOW SOON CAN YOU RESPOND CLIENT INQUIRIES?
Our team is consisted of a group of diligent and dynamic people, working 24hrs/ 7days to respond client ,inquiries and questions all the time. Most problems can be solved within 8 hours while manufacturers/factories will take much longer to give response.
4. HOW LONG WILL YOUR PRICE BE VALID?
we are a tender and friendly supplier, never greedy on windfall profit. Basically, our price remains stable through the year. We only adjust our price based on two situations: (1) The rate of USD: RMB varies significantly according to the international currency exchange rates, (2) Manufacturers/ factories adjusted the machine price, because of the increasing labor cost and raw material cost.
5. WHAT LOGISTICS WAYS YOU CAN WORK FOR SHIPMENT?
we can ship construction machinery by various transportation tools.
(1) For 80% of our shipment, the machine will go by sea, to all main continents such as Africa, South America, Middle East, Oceania and Southeast Asia etc., either by container or RoRo / Bulk shipment.
(2) For inland neighbourhood countries of China, such as Russia, Mongolia, Kazakhstan, Kyrgyzstan, Tajikistan, Uzbekistan Turkmenistan etc., we can send machines by road or railway.
(3) For light spare parts in urgent demand, we can send it by international courier service, such as DHL, TNT, UPS, or Fedex