Customization: | Available |
---|---|
After-sales Service: | Online Video Support |
Warranty: | 1 Year |
Suppliers with verified business licenses
Whole Machine
|
Overall quality
|
1940
|
Bucket capacity
|
0.04
|
|
Bucket capacity range
|
0.04
|
|
Ground pressure
|
0.25
|
|
Walking speed (low, high)
|
2.0/3.6
|
|
Swing speed
|
8.5
|
|
Engine
|
model
|
D782-E3B
|
power
|
9.8/2300
|
|
Displacement
|
0.778
|
|
Fuel tank capacity
|
13
|
|
Hydraulic system
|
Work pressure
|
21.6/18.6
|
flow
|
7.2x2+4.5
|
|
Fuel tank capacity
|
18
|
|
Digging power
|
Maximum digging force of bucket
|
15.2
|
Maximum digging force of stick
|
8.8
|
|
Bulldozer board
|
Dimensions (width×height)
|
990×260
|
Working height (above/underground)
|
168/249
|
1. HOW IS YOUR PRICE COMPARED WITH MANUFACTURERS OR FACTORIES?
we work as the leading dealers of various leading China construction machinery manufacture/I factories, and are constantly treated with best dealership price. From numerous comparison and feedback from clients, our prices is more competitive than the price from manufacturers/ factories.
2. HOW IS YOUR DELIVERY TIME?
In general circumstance, we can have an immediate delivery of regular machines for our clients within 7 days, because we have a variety of resources to check machines in stock, locally and nation widely, and to receive machines in timely manner. But for manufacturers/ I factories, It will take more than 30 days to produce the ordered machine.
3. HOW SOON CAN YOU RESPOND CLIENT INQUIRIES?
Our team is consisted of a group of diligent and dynamic people, working 24hrs/ 7days to respond client ,inquiries and questions all the time. Most problems can be solved within 8 hours while manufacturers/factories will take much longer to give response.
4. HOW LONG WILL YOUR PRICE BE VALID?
we are a tender and friendly supplier, never greedy on windfall profit. Basically, our price remains stable through the year. We only adjust our price based on two situations: (1) The rate of USD: RMB varies significantly according to the international currency exchange rates, (2) Manufacturers/ factories adjusted the machine price, because of the increasing labor cost and raw material cost.
5. WHAT LOGISTICS WAYS YOU CAN WORK FOR SHIPMENT?
we can ship construction machinery by various transportation tools.
(1) For 80% of our shipment, the machine will go by sea, to all main continents such as Africa, South America, Middle East, Oceania and Southeast Asia etc., either by container or RoRo / Bulk shipment.
(2) For inland neighbourhood countries of China, such as Russia, Mongolia, Kazakhstan, Kyrgyzstan, Tajikistan, Uzbekistan Turkmenistan etc., we can send machines by road or railway.
(3) For light spare parts in urgent demand, we can send it by international courier service, such as DHL, TNT, UPS, or Fedex