Customization: | Available |
---|---|
After-sales Service: | Online Video Support |
Max. Lifting Height: | 77m |
Suppliers with verified business licenses
Item | Unit | Parameter value |
Parameter Item | - | XGC75 |
Operation performance parameter | * | |
Max. rated lifting capacity for boom | (t) | 75 |
Max. rated lifting capacity for fixed jib | (t) | 12 |
Max. rated lifting capacity for luffing jib | (t) | - |
Max. load moment | (t.m) | 286 |
Max. rated lifting capacity for tower jib | (t) | - |
Max. rated lifting capacity for boom single top | (t) | 6.5 |
Max. rated lifting capacity for special jib | (t) | - |
Dimension parameter | * | |
Boom length | (m) | 13~58 |
Boom luffing angle | (°) | -3~80 |
Fixed jib length | (m) | 7~19 |
Tower jib length | (m) | - |
Max. dimension of single unit in transport state(L×W×H) | (m) | 12.7×3.4×3.4 |
Fixed jib offset angle | (°) | 10,30 |
Special jib length | (m) | - |
Speed parameter | * | |
Max. single line speed for hoist mechanism | (m/min) | 128 |
Max. single line speed for boom luffing mechanism | (m/min) | 70 |
Max. single line speed for jib luffing mechanism | (m/min) | - |
Max. slewing speed | (r/min) | 3 |
Max. travel speed | (km/h) | 1.4 |
Grade ability | (%) | 30 |
Mean ground pressure | (MPa) | 0.08 |
Max. single line speed for tower jib luffing mechanism | (m/min) | - |
Max. single line speed for superlift luffing | (m/min) | - |
Engine | * | |
Model | - | SC7H210/QSB6.7 |
Engine power | (kW) | 155/153 |
Emission | - | National III/EU III |
Mass parameter | * | |
Overall crane mass | (t) | 61(main hook, 13m boom) |
Max. mass of single unit in transport state | (t) | 37 |
1. HOW IS YOUR PRICE COMPARED WITH MANUFACTURERS OR FACTORIES?
we work as the leading dealers of various leading China construction machinery manufacture/I factories, and are constantly treated with best dealership price. From numerous comparison and feedback from clients, our prices is more competitive than the price from manufacturers/ factories.
2. HOW IS YOUR DELIVERY TIME?
In general circumstance, we can have an immediate delivery of regular machines for our clients within 7 days, because we have a variety of resources to check machines in stock, locally and nation widely, and to receive machines in timely manner. But for manufacturers/ I factories, It will take more than 30 days to produce the ordered machine.
3. HOW SOON CAN YOU RESPOND CLIENT INQUIRIES?
Our team is consisted of a group of diligent and dynamic people, working 24hrs/ 7days to respond client ,inquiries and questions all the time. Most problems can be solved within 8 hours while manufacturers/factories will take much longer to give response.
4. HOW LONG WILL YOUR PRICE BE VALID?
we are a tender and friendly supplier, never greedy on windfall profit. Basically, our price remains stable through the year. We only adjust our price based on two situations: (1) The rate of USD: RMB varies significantly according to the international currency exchange rates, (2) Manufacturers/ factories adjusted the machine price, because of the increasing labor cost and raw material cost.
5. WHAT LOGISTICS WAYS YOU CAN WORK FOR SHIPMENT?
we can ship construction machinery by various transportation tools.
(1) For 80% of our shipment, the machine will go by sea, to all main continents such as Africa, South America, Middle East, Oceania and Southeast Asia etc., either by container or RoRo / Bulk shipment.
(2) For inland neighbourhood countries of China, such as Russia, Mongolia, Kazakhstan, Kyrgyzstan, Tajikistan, Uzbekistan Turkmenistan etc., we can send machines by road or railway.
(3) For light spare parts in urgent demand, we can send it by international courier service, such as DHL, TNT, UPS, or Fedex.